2026-07-28 - 2026-07-31
Overview
4 Issues created by 1 user
Opened
#160 Per-user and per-project calendars readable in Outlook — unlock the scopes the feed already models, and solve the mirroring problem
Opened
#161 Zuständigkeit auf Fristen und Termine — assignee field, plus "meine Fristen" everywhere it should exist
Opened
#162 One convention for preliminary or to-be-amended information — brackets, everywhere, rather than silent omission
Opened
#163 parties.role is free text and other is the default arm of a switch — a misspelled role silently drops a party out of the Rubrum
37 Unresolved Conversations
Open
#139
Submission templates: select court address + team members for letterhead (variable bag extension)
Open
#154
prod 500s after B1+B2 deploy — /api/builder/scenarios + /api/events?type=deadline failing
Open
#159
Decide which firm domain is canonical — accounts exist on hoganlovells.com while the live domain is hlc.com, and three products key off the pair
Open
#44
Migration runner is fragile under parallel-merge — replace single-counter tracker with applied-set
Open
#7
Bulk team email — send to filtered selection from /team page
Open
#149
RFC: full revision of the deadline + procedural-events system — two entry paths, unified scenario state, editorial completion
Open
#148
Fristenrechner: trigger picker accepts all events; cross-party follow-ups must show with annotation; scenario flags must sync with conditional checkboxes
Open
#150
UPC per-jurisdiction holidays — seed national + state-level holidays for every division country and link the UPC location page
Open
#158
Skeleton generator: service-address line renders raw English in DE — stale @hoganlovells.com match (needs rebrand-domain decision)
Open
#155
Submission generator — unified auto-naming scheme (date · initiator · …) + customizable
Open
#115
/views/any: none of the filters work (regression from today's filter-bar churn)
Open
#153
PRD: Procedures tool — columnar litigation planner (overview / event-triggered / case-file)
Open
#126
Conditional rendering: wrong parent — R.262(2) shows 'abhängig von Klageerhebung' instead of 'abhängig von Vertraulichkeitsantrag'
Open
#128
Verfahrensablauf: sort post-trigger optional events by duration ascending (14d → 1mo → 2mo …)
Open
#143
Editorial backlog: seed 279 candidate UPC RoP events into deadline_rules (full catalog gap)
Open
#121
Verfahrensablauf: rules anchored on uncertain triggers render concrete dates (R.109 backward-anchor without oral-hearing date, R.262(2) without Vertraulichkeitsantrag)
Open
#152
Extend /tools/procedures: where-am-I + what's-next workflow tracker on top of the unified catalog (m/paliad#151 follow-up)
Open
#157
PRD: docforge — modular doc-generator engine for paliad + upc-commentary
Open
#151
Unified procedural-events tool — multi-dimensional display, filter, sequence, selection (consolidate surfaces)
Open
#146
Fristenrechner: complete UX overhaul — dual-mode (direct search/filter + guided wizard) with project-file write-back
Open
#147
proceeding_types taxonomy cleanup — separate primary proceedings from phases and cross-cutting admin
Open
#124
Litigation Planner suite — extract Fristenrechner/Verfahrensablauf into a Go package for paliad + youpc.org reuse (inventor)
Open
#141
PRD + inventor design: submission generator v2 — sectioned composition, swappable base templates, in-app editing, building blocks
Open
#142
Seed 6 UPC PI respondent-side events into deadline_rules
Open
#119
Submission generator: form revision — drop 'Frist' block from output, group sections, add multi-party picker with Add Party + DB selection
Open
#117
UPC Damages proceeding: missing post-submission court followup (oral hearing, interim conference, appeal route)
Open
#118
UPC Provisional Measures (upc.pi.cfi): missing appeal route + related deadlines
Open
#116
Wave 1 — Tier 1 rule additions: 12 high-frequency procedural events from curie's audit (incl. UPC Interim Conference R.105)
Open
#114
CI/CD: pre-deploy test + migration gate so paliad.de stays online through failed deploys (inventor)
Open
#112
Search inputs: magnifying-glass icon overlaps placeholder text (Fristenrechner 'Akte suchen' + audit other search fields)
Open
#110
Symmetric date-range picker: 3 columns (Past / NOW / Future), each sorted by closeness to NOW
Open
#111
Verfahrensablauf: party selector goes AFTER proceeding-type selector (defines proceeding too; auto-filled when project data present)
Open
#113
Admin deadline-rules list: 'upc.apl.cost · undefined' — proceeding name missing in API response or frontend render
Open
#131
HOTFIX 2: mig 134 missing set_config('paliad.audit_reason', …) — paliad still offline after #130
Open
#130
HOTFIX: mig 134 violates paliad_proceeding_code_shape (paliad.de offline, crash-loop)
Open
#50
Auto-derived project codes from the tree (e.g. EXMPL.OPNT.567.INF.CFI), custom override wins
Open
#41
DE proceedings: one combined timeline per type (Verletzungsverfahren = LG→OLG→BGH, Nichtigkeitsverfahren = BPatG→BGH)