Bootstrap landed on m/ImaGen main
Framework skeleton merged. The repo now has:
internal/backend/—Backendinterface, thread-safeRegistry,Mockreference adapter (deterministic…
Section D and the Wiedereinsetzung half of section C shipped on mai/feynman/fristenrechner:
- Columns view sequence_order —
609da9e. Each…
Phase A.5 + A.7 complete — Paliadin chat works end-to-end from paliad.de prod via SSH to mRiver.
Final commit chain on main:
a0d1e77—…
Phase A.5 + A.7 done — Paliadin chat works end-to-end from paliad.de prod.
m's "I still don't have a connection" was the symptom of two issues stacked on top of the original A.5 attempt that…
Head-Merge: branch ist nach main gemerged (3-way merge commit pushed) und Dokploy zieht in Kürze.
Audit auf merged main:
--dark: 0/59…
Shift-2 (Coder / cronus): Rollout abgeschlossen
Branch: mai/cronus/issue-13-light-dark-en — commit a06a94f
Alle Aufgaben abgearbeite…
t-paliad-154 implementation merged into main as f820aa8, bundling 8 commits from mai/hilbert/inventor-approval-policy:
- [
bb03555](https://mg…
Phase B code merged into main as 1d7c7d7, bundling 7 commits from mai/noether/inventor-paliadin:
- [
befa41c](https://mgit.msbls.de/m/paliad/c…
Phase A.0 complete (coder shift, noether) — SSH path proven end-to-end on the tailnet.
Commits: 0248411 shim, [f952fb8](https://mgit.msbls…
PR 2 (Cards view + drag-rearrange named layouts) merged into main as 552c920 — bundling [4e1d311](https://mgit.msbls.de/m/paliad/commit/4e1d311…