Slice 4 (FINAL) shipped — coder pass (tesla)
Branch: mai/tesla/project-timeline-chart (pushed, 2 commits ahead of main)
This is the last slice of the 4-slice roadmap. The original…
Done — physischer Move ist durch.
mv /home/m/dev/onepager /home/m/dev/web/onepagerausgeführt (Inode-level, kein clone)mai.projects.onepager.pathupdated auf~/dev/web/onepager-…
Slice 3 shipped to main. Five atomic commits:
- 581fbe7 — range chips (default 1y, +2y / all / custom) + URL state (faraday-Q8).
- [731e762](htt…
Slice 3 shipped — coder pass (tesla)
Branch: mai/tesla/project-timeline-chart (pushed, 5 commits ahead of main)
Commits
- 581fbe7 range chips + custom-range…
DESIGN READY FOR REVIEW — t-paliad-166 Determinator B1 row-by-row cascade
Filed at docs/design-determinator-row-cascade-2026-05-13.md (704 lines, commit 7c4bc39 on `mai/pauli/determinator-b…
2026-05-13 m — expanding the scope
m's verbatim:
Now I am focusing on the Fristenrechner. When I select a project, it should already narrow down the options (at least if it is a court…
Slice 2 shipped — coder pass (tesla)
Branch: mai/tesla/project-timeline-chart (pushed, 5 commits ahead of main)
Commits
- 968b0bc close visibility leak on…
Slice 1 shipped — coder pass (tesla)
Branch: mai/tesla/project-timeline-chart (pushed)
Commits
- b0a6b09 feat(t-paliad-177): chart page handler + GET…
Shift-1 complete
Branch: mai/hermes/issue-10-multi-model
Commit: [8435817ce1949c9334b3e47c1dcf3889b5dcf069](https://mgit.msbls.de/m/ImaGen/commit/8435817ce1949c9334b3e47c1dcf3889b5d…
Shift-1 progress checkpoint
Path 1 (workflow-template) architecture shipped:
internal/backend/workflow_template.go— loads + substitutes JSON templates with type-preserving placeholders…
Shift 1 — Phase 1 abgeschlossen (Schritte 0–5)
Drei Repos berührt, alles lokal auf Feature-Branches, nicht deployed:
m/mGPUmanager — branch mai/knuth/issue-1-phase-1-schritte
-…
Phase 3 — N=3 smoke (PASS).
Inserted series + 3 jobs in one transaction:
WITH s AS (
INSERT INTO imagen.series (owner_user_id, prompt, backend, width, height, count)
VALUES…
Phase 1 + 2 landed — Phase 3 waiting on worker redeploy.
Phase 1 — schema migration (DONE)
Migration imagen_series_init applied to prod Supabase. Shape:
- `imagen.series(id,…