mAi
1718ea2eae
Paliad CI gate / build (push) Has been cancelled
Paliad CI gate / test-go (push) Has been cancelled
Paliad CI gate / deploy (push) Has been cancelled
Merge: t-paliad-335 — unified /tools/procedures shipped U0-U4 (m/paliad#151)
knuth shipped all 5 slices in one shift, per cronus's design:
U0 60907e7 — skeleton: new /tools/procedures route + page shell + 4 entry tabs + filter strip with search box + tree+linear-drawer scaffold
U1 0568d34 — fold Mode A (Direkt suchen) — porting fristenrechner-mode-a.ts
U2 c8261da — fold Mode B (Geführt wizard) — porting fristenrechner-wizard.ts
U3 48a07ef — fold Verfahrensablauf tree + 3-way detail filter — porting verfahrensablauf.ts + detail-mode.ts
U4 39c8ef3 — hard-cut 301: /tools/fristenrechner + /tools/verfahrensablauf → /tools/procedures; retire dual surfaces
Net: -4,452 LoC across 20 files (consolidating + dropping legacy). bun build clean, 264 frontend tests pass, go vet + go test ./... clean.
Comment posted on m/paliad#151. Per-project scenario_flags binding from Phase 2 P0 still drives the unified tool's per-rule chips.
2026-05-27 20:35:44 +02:00
..
2026-04-27 20:15:17 +02:00
2026-05-19 13:17:07 +02:00
2026-05-27 20:35:44 +02:00
2026-05-27 20:34:54 +02:00
2026-04-14 16:50:27 +02:00
2026-04-14 16:50:27 +02:00
2026-04-14 16:50:27 +02:00
2026-04-14 16:50:27 +02:00