Commit Graph

1 Commits

Author SHA1 Message Date
m
80fdab0963 docs(t-paliad-067): polish audit triage 2 — classify F-01..F-50, propose 3 PRs
Re-verified every BATCH finding from docs/audit-polish-2026-04-27.md
against the post-PR-B/D/E + palette + firm-name codebase.

- 18 OBSOLETE (already shipped via t-paliad-060/061/062/063/064/065).
- 26 KEEP — bundled into PR-1 (i18n leak sweep + activity log), PR-2
  (visual residue + small per-page polish), PR-3 (tab/chip/notes-hint
  consistency).
- 1 RESCOPED (F-20 colour fixed by palette sweep, structural rule
  consolidation still pending).
- 7 DEFER — design-call or redesign-class items (F-23, F-25, F-32, F-38,
  F-40, F-48, F-49).

Top-5 user-visible items ranked: F-07 dashboard activity narrative, F-15
red archive button, F-04 raw i18n key on /deadlines/new, F-12 AKTE column
header (rename residue), F-13 appointments AKTE cell collision.

DESIGN-READY GATE — head reviews before any coder shift.
2026-04-29 13:58:51 +02:00